Since the early 90's GrenCo has become known as a high quality manufacturer of PC Pump surface equipment. In recent years GrenCo has been involved in implementing our own, in house, manufacturing and R&D of progressing cavity pumps including the injection of stators and peeling of rotors. GrenCo can now provide a complete, turn key, solution including the design, manufacturing, testing, training and supply of you progressing cavity pump lift system PCP-2100.    
 
The NEW M-2100 mid range wellhead drive is in production and is available for delivery starting July, 2008. This wellhead drive includes all the same standard features such as our patented sealing system, proven brake system that have made GrenCo wellhead drives so popular. It is available as a Direct Drive up to 40Hp and as a beltless Gearbox Drive 2:1 reduction.
 
The NEW generation KD-2150 Kombi-Drive variable frequency drive is available for delivery starting July, 2008. This VFD now includes ASCL which is a sensorless closed loop control. The ASCL provides superior speed and torque control compared to the sensorless flux vector currently on the market. Also included is a new operator display with more great than previous, including: large touch screen, 30 day graphical history, time and date stamped error history, and more.
 
Global Petroleum Show,
Calgary, Alberta, Canada
June 8-10, 2010
 
2010 will mark the 21st Global Petroleum Show as the most significant petroleum event anywhere in the world.  Since its inception in 1968, the event has grown to be renowned for first-rate presentation of the latest in technology in the fields of onshore and offshore exploration, production and transportation.
 
Lloydminster Heavy Oil Show,
Lloydminster, Alberta, Canada,
September 15-16, 2010.